Challenge
Custom engineered solution for reliable ESD of a LNG pipeline.
Solution
Three critical components working in tandem to provide three areas of failure.
The actuator closes in under 3 seconds when tripped via control panel, and, upon loss of a single control circuit, it maintains current position.
Application
Oil & Gas - Natural Gas